SISTEM INFORMASI MANAJEMEN (SIM)
PROYEK REHABILITASI DAN REKONSTRUKSI MASYARAKAT DAN PERMUKIMAN BERBASIS KOMUNITAS
(RE-KOMPAK)
UNTUK WILAYAH NAD DAN NIAS
NAMA PROPINSI : Nanggroe Aceh Darussalam (NAD)
STATUS DATA TANGGAL : 31 Desember 2009

 NO  KETERANGAN  NILAI
 1  PROFIL ORGANISASI MASYARAKAT
 1.1  Jumlah Desa  180
 1.2  Organisasi Masyarakat
 1.2.1  Jumlah TPK  131
 1.2.2  Jumlah BKM  49
 1.3  Sub Organisasi Masyarakat
 1.3.1  Jumlah Seksi Pelaksana  551
 1.3.2  Jumlah KSM-L  294
 1.4  Jumlah Penerima Manfaat  132.201
 2  PROFIL CSP
 2.1  Volume
 2.1.1 Jalan (m)  185.140,81
 2.1.2 Culvert (unit)  838
 2.1.3 Jembatan (m)  247,55
 2.1.4 Drainase (m)  171.310,05
 2.1.5 Talud (m)  27.447,64
 2.1.6 Plat Beton (unit)  1.556
 2.1.7 Sumber Air (unit)  2.057
 2.1.8 MCK (unit)  32
 2.1.9 Balai Umum (unit)  34
 2.1.10 Penerangan (unit)  10
 2.1.11 Escape Road (m)  362,00
 2.1.12 Fasilitas Rumah (m)  -
 2.1.13 Fasilitas Kesehatan (unit)  2
 2.1.14 Fasilitas Pendidikan (unit)  -
 2.1.15 Escape Building (unit)  -
 2.1.16 Fasilitas Sanitasi (unit)  17
 2.1.17 Lain-lain:Pagar Balai Umum (m)  391,50
 2.1.18 Lain-lain:Bangunan Bagi (Box) (unit)  7
 2.1.19 Lain-lain:Pintu Air (unit)  7
 2.1.20 Lain-lain:Saluran/Jaringan Air Bersih (m)  1.407,30
 2.1.21 Lain-lain:Bak Penampung Air (unit)  8
 2.1.22 Lain-lain:Plesteran (m)  115,00
 2.1.23 Lain-lain:Bedeng Material (unit)  1
 2.1.24 Lain-lain:balok beton penyangga (unit)  46
 2.1.25 Lain-lain:PINTU PENGONTROL PEMBUANGAN (unit)  1
 2.1.26 Lain-lain:Kerb Beton (m)  202,38
 2.1.27 Lain-lain:urugan tanah (m)  408,00
 2.1.28 Lain-lain:instalasi air bersih (m)  3.894,00
 2.1.29 Lain-lain:Pagar Fasilitas Kesehatan (m)  20,00
 2.1.30 Lain-lain:Perkerasan Jalan Telford (m)  757,14
 2.1.31 Lain-lain:PEMASANGAN KERAMIK BALAI UMUM (unit)  1
 2.1.32 Lain-lain:Traffic Bump (unit)  10
 2.1.33 Lain-lain:Broncaptering (unit)  2
 2.1.34 Lain-lain:LANTAI BALAI UMUM (m)  478,00
 2.1.35 Lain-lain:TIANG BALAI UMUM (m)  60,00
 2.1.36 Lain-lain:PAGAR TPU (m)  60,00
 2.1.37 Lain-lain:Box Valve (unit)  15
 2.1.38 Lain-lain:PELEBARAN JALAN/PENGERUKAN (m)  80,00
 2.1.39 Lain-lain:Jembatan Pipa (unit)  18
 2.1.40 Lain-lain:CUTING HILL (m)  190,00
 2.1.41 Lain-lain:Dermaga (m)  25,00
 2.1.42 Lain-lain:Pipa Distribusi (m)  2.660,00
 2.1.43 Lain-lain:Accessoris Pipa GI (unit)  1
 2.2  RAB
 2.2.1 Jalan (Rp)  39.261.196.013,05
 2.2.2 Culvert (Rp)  3.091.878.090,85
 2.2.3 Jembatan (Rp)  1.302.422.686,00
 2.2.4 Drainase (Rp)  30.525.627.494,06
 2.2.5 Talud (Rp)  8.114.249.936,59
 2.2.6 Plat Beton (Rp)  1.492.961.725,29
 2.2.7 Sumber Air (Rp)  4.253.737.098,93
 2.2.8 MCK (Rp)  1.187.006.398,55
 2.2.9 Balai Umum (Rp)  5.646.926.596,00
 2.2.10 Penerangan (Rp)  3.320.000,00
 2.2.11 Escape Road (Rp)  20.916.360,00
 2.2.12 Fasilitas Rumah (Rp)  -
 2.2.13 Fasilitas Kesehatan (Rp)  221.177.076,00
 2.2.14 Fasilitas Pendidikan (Rp)  -
 2.2.15 Escape Building (Rp)  -
 2.2.16 Fasilitas Sanitasi (Rp)  76.873.000,00
 2.2.17 Lain-lain:Pagar Balai Umum (Rp)  185.963.000,00
 2.2.18 Lain-lain:Bangunan Bagi (Box) (Rp)  10.914.998,00
 2.2.19 Lain-lain:Pintu Air (Rp)  133.905.005,00
 2.2.20 Lain-lain:Saluran/Jaringan Air Bersih (Rp)  48.331.674,89
 2.2.21 Lain-lain:Bak Penampung Air (Rp)  108.768.842,67
 2.2.22 Lain-lain:Plesteran (Rp)  3.197.000,00
 2.2.23 Lain-lain:Bedeng Material (Rp)  2.500.000,00
 2.2.24 Lain-lain:balok beton penyangga (Rp)  4.466.700,00
 2.2.25 Lain-lain:PINTU PENGONTROL PEMBUANGAN (Rp)  41.098.474,00
 2.2.26 Lain-lain:Kerb Beton (Rp)  8.792.072,59
 2.2.27 Lain-lain:urugan tanah (Rp)  9.383.350,00
 2.2.28 Lain-lain:instalasi air bersih (Rp)  156.490.373,82
 2.2.29 Lain-lain:Pagar Fasilitas Kesehatan (Rp)  4.742.000,00
 2.2.30 Lain-lain:Perkerasan Jalan Telford (Rp)  192.763.105,00
 2.2.31 Lain-lain:PEMASANGAN KERAMIK BALAI UMUM (Rp)  23.840.000,00
 2.2.32 Lain-lain:Traffic Bump (Rp)  571.000,00
 2.2.33 Lain-lain:Broncaptering (Rp)  25.239.601,00
 2.2.34 Lain-lain:LANTAI BALAI UMUM (Rp)  100.000.000,00
 2.2.35 Lain-lain:TIANG BALAI UMUM (Rp)  20.000.000,00
 2.2.36 Lain-lain:PAGAR TPU (Rp)  19.500.000,00
 2.2.37 Lain-lain:Box Valve (Rp)  4.885.383,00
 2.2.38 Lain-lain:PELEBARAN JALAN/PENGERUKAN (Rp)  13.700.000,00
 2.2.39 Lain-lain:Jembatan Pipa (Rp)  21.831.164,00
 2.2.40 Lain-lain:CUTING HILL (Rp)  65.900.697,00
 2.2.41 Lain-lain:Dermaga (Rp)  8.586.428,00
 2.2.42 Lain-lain:Pipa Distribusi (Rp)  288.082.294,00
 2.2.43 Lain-lain:Accessoris Pipa GI (Rp)  33.757.250,00
 3  PROFIL DTPL dan Pekerjaan Tambahan
 3.1  PROFIL DTPL
 3.1.1  Jumlah DTPL Selesai  220
 3.1.2  Jumlah Paket  841
3.1.3 Jumlah Sub Proyek 2495
3.1.4 Jenis Sub Proyek
3.1.4.1 Konstruksi ( Sub Proyek ) 2430
3.1.4.2 Perbaikan ( Sub Proyek ) 65
3.1.5 Volume
3.1.5.1Jalan (m)130.575,91
3.1.5.1.1Aspal (m)3.411,06
3.1.5.1.2Perkerasan (m)11.742,35
3.1.5.1.3Beton (m)111.398,41
3.1.5.1.4Penimbunan (m)3.458,59
3.1.5.1.5Paving Block (m)565,50
3.1.5.2Culvert (unit)519
3.1.5.2.1Box Culvert (unit)136
3.1.5.2.2Cylinder Culvert (unit)255
3.1.5.2.3Plat Decker (unit)128
3.1.5.3Jembatan (m)203,45
3.1.5.3.1Beton (m)48,45
3.1.5.3.2Kayu (m)155,00
3.1.5.3.3Baja (m)0,00
3.1.5.4Drainase (m)147.361,04
3.1.5.4.1Earth-lined (m)3.021,00
3.1.5.4.2Beton (m)127.816,35
3.1.5.4.3Batu Kali (m)16.523,69
3.1.5.5Talud (m)36.485,64
3.1.5.6Plat Beton (unit)3.433
3.1.5.7Sumber Air (unit)141
3.1.5.7.1PDAM (unit)57
3.1.5.7.2Mata Air (unit)44
3.1.5.7.3Sumur Warga (unit)40
3.1.5.8MCK (unit)21
3.1.5.9Balai Umum (unit)33
3.1.5.10Penerangan (unit)10
3.1.5.11Escape Road (m)362,00
3.1.5.12Fasilitas Rumah (m)0,00
3.1.5.13Fasilitas Kesehatan (unit)2
3.1.5.14Fasilitas Pendidikan (unit)0
3.1.5.15Escape Building (unit)0
3.1.5.16Fasilitas Sanitasi (unit)3
3.1.5.17Lain-lain
3.1.5.17.1Pagar Balai Umum (m)257,00
3.1.5.17.2Bangunan Bagi (Box) (unit)0
3.1.5.17.3Pintu Air (unit)7
3.1.5.17.4Saluran/Jaringan Air Bersih (m)1.300,00
3.1.5.17.5Bak Penampung Air (unit)5
3.1.5.17.6Plesteran (m)0,00
3.1.5.17.7Bedeng Material (unit)0
3.1.5.17.8balok beton penyangga (unit)0
3.1.5.17.9PINTU PENGONTROL PEMBUANGAN (unit)1
3.1.5.17.10Kerb Beton (m)107,38
3.1.5.17.11urugan tanah (m)0,00
3.1.5.17.12instalasi air bersih (m)3.894,00
3.1.5.17.13Pagar Fasilitas Kesehatan (m)0,00
3.1.5.17.14Perkerasan Jalan Telford (m)0,00
3.1.5.17.15PEMASANGAN KERAMIK BALAI UMUM (unit)0
3.1.5.17.16Traffic Bump (unit)0
3.1.5.17.17Broncaptering (unit)3
3.1.5.17.18LANTAI BALAI UMUM (m)478,00
3.1.5.17.19TIANG BALAI UMUM (m)0,00
3.1.5.17.20PAGAR TPU (m)0,00
3.1.5.17.21Box Valve (unit)2
3.1.5.17.22PELEBARAN JALAN/PENGERUKAN (m)0,00
3.1.5.17.23Jembatan Pipa (unit)2
3.1.5.17.24CUTING HILL (m)190,00
3.1.5.17.25Dermaga (m)0,00
3.1.5.17.26Pipa Distribusi (m)1.589,00
3.1.5.17.27Accessoris Pipa GI (unit)0
3.1.6 RAB
3.1.6.1Jalan (Rp)48.915.477.030,68
3.1.6.1.1Aspal (Rp)1.598.100.841,82
3.1.6.1.2Perkerasan (Rp)1.661.611.854,56
3.1.6.1.3Beton (Rp)44.835.324.015,30
3.1.6.1.4Penimbunan (Rp)562.773.467,59
3.1.6.1.5Paving Block (Rp)257.666.851,41
3.1.6.2Culvert (Rp)2.227.188.255,31
3.1.6.2.1Box Culvert (Rp)958.992.931,20
3.1.6.2.2Cylinder Culvert (Rp)418.242.618,56
3.1.6.2.3Plat Decker (Rp)849.952.705,55
3.1.6.3Jembatan (Rp)860.533.918,00
3.1.6.3.1Beton (Rp)765.939.918,00
3.1.6.3.2Kayu (Rp)94.594.000,00
3.1.6.3.3Baja (Rp)0,00
3.1.6.4Drainase (Rp)35.690.006.495,84
3.1.6.4.1Earth-lined (Rp)117.193.937,00
3.1.6.4.2Beton (Rp)31.318.405.353,49
3.1.6.4.3Batu Kali (Rp)4.254.407.205,35
3.1.6.5Talud (Rp)10.525.953.971,40
3.1.6.6Plat Beton (Rp)1.395.970.170,97
3.1.6.7Sumber Air (Rp)1.417.633.113,25
3.1.6.7.1PDAM (Rp)260.358.150,00
3.1.6.7.2Mata Air (Rp)285.971.063,00
3.1.6.7.3Sumur Warga (Rp)871.303.900,25
3.1.6.8MCK (Rp)1.036.697.506,77
3.1.6.9Balai Umum (Rp)5.414.525.158,53
3.1.6.10Penerangan (Rp)3.320.000,00
3.1.6.11Escape Road (Rp)20.916.360,00
3.1.6.12Fasilitas Rumah (Rp)0,00
3.1.6.13Fasilitas Kesehatan (Rp)224.848.641,00
3.1.6.14Fasilitas Pendidikan (Rp)0,00
3.1.6.15Escape Building (Rp)0,00
3.1.6.16Fasilitas Sanitasi (Rp)43.842.605,00
3.1.6.17Lain-lain985.003.134,08
3.1.6.17.1Pagar Balai Umum (Rp)121.215.000,00
3.1.6.17.2Bangunan Bagi (Box) (Rp)0,00
3.1.6.17.3Pintu Air (Rp)102.045.962,00
3.1.6.17.4Saluran/Jaringan Air Bersih (Rp)34.229.578,00
3.1.6.17.5Bak Penampung Air (Rp)62.076.098,67
3.1.6.17.6Plesteran (Rp)0,00
3.1.6.17.7Bedeng Material (Rp)0,00
3.1.6.17.8balok beton penyangga (Rp)0,00
3.1.6.17.9PINTU PENGONTROL PEMBUANGAN (Rp)46.474.420,00
3.1.6.17.10Kerb Beton (Rp)8.267.072,59
3.1.6.17.11urugan tanah (Rp)0,00
3.1.6.17.12instalasi air bersih (Rp)156.490.373,82
3.1.6.17.13Pagar Fasilitas Kesehatan (Rp)0,00
3.1.6.17.14Perkerasan Jalan Telford (Rp)0,00
3.1.6.17.15PEMASANGAN KERAMIK BALAI UMUM (Rp)0,00
3.1.6.17.16Traffic Bump (Rp)0,00
3.1.6.17.17Broncaptering (Rp)40.183.238,00
3.1.6.17.18LANTAI BALAI UMUM (Rp)116.843.800,00
3.1.6.17.19TIANG BALAI UMUM (Rp)0,00
3.1.6.17.20PAGAR TPU (Rp)0,00
3.1.6.17.21Box Valve (Rp)678.990,00
3.1.6.17.22PELEBARAN JALAN/PENGERUKAN (Rp)0,00
3.1.6.17.23Jembatan Pipa (Rp)13.574.040,00
3.1.6.17.24CUTING HILL (Rp)65.900.697,00
3.1.6.17.25Dermaga (Rp)0,00
3.1.6.17.26Pipa Distribusi (Rp)217.023.864,00
3.1.6.17.27Accessoris Pipa GI (Rp)0,00
3.2 Pekerjaan Tambahan
3.2.1 Jumlah Sub Proyek 414
3.2.2 Jenis Sub Proyek
3.2.2.1 Konstruksi ( Sub Proyek ) 390
3.2.2.2 Perbaikan ( Sub Proyek ) 24
3.2.3 Volume
3.2.3.1Jalan (m)9.651,20
3.2.3.1.1Aspal (m)418,00
3.2.3.1.2Perkerasan (m)1.599,00
3.2.3.1.3Beton (m)5.248,20
3.2.3.1.4Penimbunan (m)2.386,00
3.2.3.1.5Paving Block (m)0,00
3.2.3.2Culvert (unit)135
3.2.3.2.1Box Culvert (unit)16
3.2.3.2.2Cylinder Culvert (unit)54
3.2.3.2.3Plat Decker (unit)65
3.2.3.3Jembatan (m)19,50
3.2.3.3.1Beton (m)0,00
3.2.3.3.2Kayu (m)19,50
3.2.3.3.3Baja (m)0,00
3.2.3.4Drainase (m)7.902,80
3.2.3.4.1Earth-lined (m)0,00
3.2.3.4.2Beton (m)7.532,80
3.2.3.4.3Batu Kali (m)370,00
3.2.3.5Talud (m)3.899,80
3.2.3.6Plat Beton (unit)234
3.2.3.7Sumber Air (unit)0
3.2.3.7.1PDAM (unit)0
3.2.3.7.2Mata Air (unit)0
3.2.3.7.3Sumur Warga (unit)0
3.2.3.8MCK (unit)2
3.2.3.9Balai Umum (unit)2
3.2.3.10Penerangan (unit)0
3.2.3.11Escape Road (m)0,00
3.2.3.12Fasilitas Rumah (m)0,00
3.2.3.13Fasilitas Kesehatan (unit)0
3.2.3.14Fasilitas Pendidikan (unit)0
3.2.3.15Escape Building (unit)0
3.2.3.16Fasilitas Sanitasi (unit)4
3.2.3.17Lain-lain
3.2.3.17.1Pagar Balai Umum (m)35,00
3.2.3.17.2Bangunan Bagi (Box) (unit)7
3.2.3.17.3Pintu Air (unit)3
3.2.3.17.4Saluran/Jaringan Air Bersih (m)309,30
3.2.3.17.5Bak Penampung Air (unit)1
3.2.3.17.6Plesteran (m)115,00
3.2.3.17.7Bedeng Material (unit)1
3.2.3.17.8balok beton penyangga (unit)184
3.2.3.17.9PINTU PENGONTROL PEMBUANGAN (unit)0
3.2.3.17.10Kerb Beton (m)95,00
3.2.3.17.11urugan tanah (m)446,00
3.2.3.17.12instalasi air bersih (m)350,00
3.2.3.17.13Pagar Fasilitas Kesehatan (m)20,00
3.2.3.17.14Perkerasan Jalan Telford (m)0,00
3.2.3.17.15PEMASANGAN KERAMIK BALAI UMUM (unit)1
3.2.3.17.16Traffic Bump (unit)10
3.2.3.17.17Broncaptering (unit)0
3.2.3.17.18LANTAI BALAI UMUM (m)0,00
3.2.3.17.19TIANG BALAI UMUM (m)60,00
3.2.3.17.20PAGAR TPU (m)70,00
3.2.3.17.21Box Valve (unit)0
3.2.3.17.22PELEBARAN JALAN/PENGERUKAN (m)80,00
3.2.3.17.23Jembatan Pipa (unit)0
3.2.3.17.24CUTING HILL (m)0,00
3.2.3.17.25Dermaga (m)0,00
3.2.3.17.26Pipa Distribusi (m)0,00
3.2.3.17.27Accessoris Pipa GI (unit)0
3.2.4 RAB
3.2.4.1Jalan (Rp)2.422.026.303,02
3.2.4.1.1Aspal (Rp)190.290.774,00
3.2.4.1.2Perkerasan (Rp)171.639.437,00
3.2.4.1.3Beton (Rp)1.832.248.982,02
3.2.4.1.4Penimbunan (Rp)227.847.110,00
3.2.4.1.5Paving Block (Rp)0,00
3.2.4.2Culvert (Rp)409.249.866,06
3.2.4.2.1Box Culvert (Rp)79.923.090,00
3.2.4.2.2Cylinder Culvert (Rp)59.312.667,00
3.2.4.2.3Plat Decker (Rp)270.014.109,06
3.2.4.3Jembatan (Rp)45.734.000,00
3.2.4.3.1Beton (Rp)0,00
3.2.4.3.2Kayu (Rp)45.734.000,00
3.2.4.3.3Baja (Rp)0,00
3.2.4.4Drainase (Rp)1.791.569.894,27
3.2.4.4.1Earth-lined (Rp)0,00
3.2.4.4.2Beton (Rp)1.694.192.529,27
3.2.4.4.3Batu Kali (Rp)97.377.365,00
3.2.4.5Talud (Rp)865.919.342,62
3.2.4.6Plat Beton (Rp)225.811.864,81
3.2.4.7Sumber Air (Rp)0,00
3.2.4.7.1PDAM (Rp)0,00
3.2.4.7.2Mata Air (Rp)0,00
3.2.4.7.3Sumur Warga (Rp)0,00
3.2.4.8MCK (Rp)25.236.401,86
3.2.4.9Balai Umum (Rp)80.878.000,00
3.2.4.10Penerangan (Rp)0,00
3.2.4.11Escape Road (Rp)0,00
3.2.4.12Fasilitas Rumah (Rp)0,00
3.2.4.13Fasilitas Kesehatan (Rp)0,00
3.2.4.14Fasilitas Pendidikan (Rp)0,00
3.2.4.15Escape Building (Rp)0,00
3.2.4.16Fasilitas Sanitasi (Rp)760.449,00
3.2.4.17Lain-lain211.798.094,89
3.2.4.17.1Pagar Balai Umum (Rp)18.438.000,00
3.2.4.17.2Bangunan Bagi (Box) (Rp)10.797.160,00
3.2.4.17.3Pintu Air (Rp)14.121.000,00
3.2.4.17.4Saluran/Jaringan Air Bersih (Rp)18.365.884,89
3.2.4.17.5Bak Penampung Air (Rp)14.559.000,00
3.2.4.17.6Plesteran (Rp)3.197.000,00
3.2.4.17.7Bedeng Material (Rp)2.500.000,00
3.2.4.17.8balok beton penyangga (Rp)4.466.700,00
3.2.4.17.9PINTU PENGONTROL PEMBUANGAN (Rp)0,00
3.2.4.17.10Kerb Beton (Rp)525.000,00
3.2.4.17.11urugan tanah (Rp)11.883.350,00
3.2.4.17.12instalasi air bersih (Rp)30.000.000,00
3.2.4.17.13Pagar Fasilitas Kesehatan (Rp)4.742.000,00
3.2.4.17.14Perkerasan Jalan Telford (Rp)0,00
3.2.4.17.15PEMASANGAN KERAMIK BALAI UMUM (Rp)23.840.000,00
3.2.4.17.16Traffic Bump (Rp)571.000,00
3.2.4.17.17Broncaptering (Rp)0,00
3.2.4.17.18LANTAI BALAI UMUM (Rp)0,00
3.2.4.17.19TIANG BALAI UMUM (Rp)20.000.000,00
3.2.4.17.20PAGAR TPU (Rp)19.500.000,00
3.2.4.17.21Box Valve (Rp)0,00
3.2.4.17.22PELEBARAN JALAN/PENGERUKAN (Rp)14.292.000,00
3.2.4.17.23Jembatan Pipa (Rp)0,00
3.2.4.17.24CUTING HILL (Rp)0,00
3.2.4.17.25Dermaga (Rp)0,00
3.2.4.17.26Pipa Distribusi (Rp)0,00
3.2.4.17.27Accessoris Pipa GI (Rp)0,00
 4  RAPAT WARGA
 4.1  Rapat Selama Penyusunan CSP
 4.1.1  Jumlah Desa Yang Sudah Melaksanakan  96
 4.1.2  Jumlah Rapat  177
 4.1.3  Jumlah Peserta  5.709
 4.1.4  Jumlah Peserta Wanita  2.055
 4.2  Rapat Selama Penyusunan DTPL
 4.2.1   Jumlah Desa Yang Sudah Melaksanakan  135
 4.2.2   Jumlah Rapat  270
 4.2.3  Jumlah Peserta  8.402
 4.2.4  Jumlah Peserta Wanita  3.164
 4.3  Rapat untuk Sosialisasi dan Koordinasi BDL
 4.3.1  Jumlah Desa Yang Sudah Melaksanakan  134
 4.3.2  Jumlah Rapat  304
 4.3.3  Jumlah Peserta  9.835
 4.3.4  Jumlah Peserta Wanita  3.548
 4.4  Rapat Khusus Perempuan untuk Sosialisasi dan Koordinasi BDL
 4.4.1  Jumlah Desa Yang Sudah Melaksanakan  141
 4.4.2  Jumlah Rapat  191
 4.4.3  Jumlah Peserta  5.577
 4.5  Rapat Untuk Pembentukan KSML / SP
 4.5.1  Jumlah Desa Yang Sudah Melaksanakan  139
 4.5.2  Jumlah Rapat  545
 4.5.3  Jumlah Peserta  17.809
 4.5.4  Jumlah Peserta Wanita  5.833
 4.6  Rapat Penyusunan RPD /RTD
 4.6.1  Jumlah Desa Yang Sudah Melaksanakan  102
 4.6.2  Jumlah Rapat  562
 4.6.3  Jumlah Peserta  9.519
 4.6.4  Jumlah Peserta Wanita  2.787
 4.6.5  Jumlah Relawan  159
 4.6.6  Jumlah Relawan Wanita  75
 4.7  Rapat Pertanggungjawaban RPD / RTD
 4.7.1  Jumlah Desa Yang Sudah Melaksanakan  96
 4.7.2  Jumlah Rapat  386
 4.7.3  Jumlah Peserta  10.951
 4.7.4  Jumlah Peserta Wanita  3.214
 4.7.5  Jumlah Relawan  195
 4.7.6  Jumlah Relawan Wanita  69
 4.8  Rapat Pra Konstruksi
 4.8.1  Jumlah Desa Yang Sudah Melaksanakan  132
 4.8.2  Jumlah Rapat  266
 4.8.3  Jumlah Peserta  7.608
 4.8.4  Jumlah Peserta Wanita  2.353
 4.8.5  Jumlah Relawan  310
 4.8.6  Jumlah Relawan Wanita  131
 4.9  Rapat Selama Konstruksi
 4.9.1  Jumlah Desa Yang Sudah Melaksanakan  61
 4.9.2  Jumlah Rapat  121
 4.9.3  Jumlah Peserta  2.276
 4.9.4  Jumlah Peserta Wanita  515
 4.9.5  Jumlah Relawan  151
 4.9.6  Jumlah Relawan Wanita  63
 4.10  Rapat Pasca Konstruksi
 4.10.1  Jumlah Desa Yang Sudah Melaksanakan  46
 4.10.2  Jumlah Rapat  61
 4.10.3  Jumlah Peserta  1.511
 4.10.4  Jumlah Peserta Wanita  390
 4.10.5  Jumlah Relawan  73
 4.10.6  Jumlah Relawan Wanita  30
 5  PENYALURAN DAN PENCAIRAN
 5.1  Salur Fase I
 5.1.1  Salur Tahap I
 5.1.1.1  Jumlah Desa  122
 5.1.1.2  Jumlah Nilai  24.394.720.461,00
 5.1.1.3  Total BOP  710.526.144,00
 5.1.2  Salur Tahap II
 5.1.2.1  Jumlah Desa  120
 5.1.2.2  Jumlah Nilai  35.730.174.690,00
 5.1.2.3  Total BOP  1.040.682.238,00
 5.1.3   Pencairan
 5.1.3.1  Jumlah Paket Yang Sudah Pencairan  512
 5.1.3.2  Total Nilai Pencairan  59.937.618.350,47
 5.1.3.3  Persentase Nilai Pencairan ( % )  99,69
 5.2  Salur Reward
 5.2.1  Salur Reward
 5.2.1.1  Jumlah Desa  5
 5.2.1.2  Jumlah Nilai  1.365.000.000,00
 5.2.1.3  Total BOP  39.496.893,00
 5.2.2   Pencairan
 5.2.2.1  Jumlah Paket Yang Sudah Pencairan  12
 5.2.2.2  Total Nilai Pencairan  1.354.559.000,00
 5.2.2.3  Persentase Nilai Pencairan ( % )  99,24
 5.3  Salur Fase II
 5.3.1  Salur Tahap I
 5.3.1.1  Jumlah Desa  93 ( 35 lama + 58 baru )
 5.3.1.2  Jumlah Nilai  18.600.000.000,00
 5.3.1.3  Total BOP  541.747.599,00
 5.3.2  Salur Tahap II
 5.3.2.1  Jumlah Desa  75 ( 34 lama + 41 baru )
 5.3.2.2  Jumlah Nilai  21.986.002.000,00
 5.3.2.3  Total BOP  640.368.985,00
 5.3.3   Pencairan
 5.3.3.1  Jumlah Paket Yang Sudah Pencairan  299
 5.3.3.2  Total Nilai Pencairan  40.255.924.124,00
 5.3.3.3  Persentase Nilai Pencairan ( % )  99,19
 6  PROGRESS FISIK DAN KEUANGAN
 6.1  Progress Keuangan (Paket)
 6.1.1  Fase I
 6.1.1.1  0% ≤ progress ≤ 40%  4
 6.1.1.2  40% < progress < 80%  24
 6.1.1.3  80% < progress ≤100%  13
 6.1.1.4  Selesai (100%)  471
 6.1.2  Reward
 6.1.2.1  0% ≤ progress ≤ 40%  0
 6.1.2.2  40% < progress < 80%  0
 6.1.2.3  80% < progress ≤100%  2
 6.1.2.4  Selesai (100%)  10
 6.1.3  Fase II
 6.1.3.1  0% ≤ progress ≤ 40%  24
 6.1.3.2  40% < progress < 80%  22
 6.1.3.3  80% < progress ≤100%  28
 6.1.3.4  Selesai (100%)  243
 6.2  Progress Fisik (Sub proyek)
 6.2.1  Fase I
 6.2.1.1  0% ≤ progress ≤ 25%  13
 6.2.1.2  25% < progress ≤ 50 %  0
 6.2.1.3  50% < progress ≤ 75%  0
 6.2.1.4  75% < progress < 100%  0
 6.2.1.5  Selesai (100%)  1585
 6.2.2  Reward
 6.2.2.1  0% ≤ progress ≤ 25%  2
 6.2.2.2  25% < progress ≤ 50 %  0
 6.2.2.3  50% < progress ≤ 75%  0
 6.2.2.4  75% < progress < 100%  0
 6.2.2.5  Selesai (100%)  20
 6.2.3  Fase II
 6.2.3.1  0% ≤ progress ≤ 25%  3
 6.2.3.2  25% < progress ≤ 50 %  1
 6.2.3.3  50% < progress ≤ 75%  0
 6.2.3.4  75% < progress < 100%  1
 6.2.3.5  Selesai (100%)  1086
 6.3  Total HOK (Orang)
 6.3.1  Fase I  139.754
 6.3.2  Reward  1.861
 6.3.3  Fase II  109.510
 7  CHECKLIST KELENGKAPAN PEMBUKUAN
 7.1  Jumlah Desa Yang Telah Diperiksa  81
 7.2  Presentase Hasil Pengecekan (%)
 7.2.1  Buku Bank,Kas,Material,BOP,Upah dan Laporan dibuat sesuai Standar yang ditetapkan(Buku Tata Cara Operasional) - OK  81
 7.2.2  Pencatatan pada buku-buku dilakukan tepat waktu - OK  80
 7.2.3  Apakah saldo buku bank sama dengan buku tabungan - OK  80
 7.2.4  Apakah saldo Buku kas sama dengan jumlah uang tunai - OK  79
 7.2.5  Laporan bulanan ditempel pada papan informasi - OK  80
 7.2.6  FasFin melakukan pemeriksaan RPD/RTD - OK  80
 8  EVALUASI FISIK DAN KEUANGAN
 8.1  Evaluasi Fisik
 8.1.1  Jumlah Sub Proyek Yang Sudah Dievaluasi  488
 8.1.2  Penilaian Kualitas
 8.1.2.1  Kategori Memenuhi (Sub Proyek)  488
 8.1.2.2  Kategori Tidak Memenuhi (Sub Proyek)  0
 8.1.3  Penilaian Kuantitas
 8.1.3.1  Kategori Memenuhi (Sub Proyek)  488
 8.1.3.2  Kategori Tidak Memenuhi (Sub Proyek)  0
 8.2  Evaluasi Keuangan
 8.2.1  Penggunaan Dana Salur I
 8.2.1.1  Desa yang Sudah Diperiksa  58
 8.2.1.2  Kategori Baik (Desa)  56
 8.2.1.3  Kategori Cukup (Desa)  2
 8.2.1.4  Kategori Kurang (Desa)  0
 8.2.2  Penggunaan Dana Salur II
 8.2.2.1  Desa yang Sudah Diperiksa  49
 8.2.2.2  Kategori Baik (Desa)  46
 8.2.2.3  Kategori Cukup (Desa)  2
 8.2.2.4  Kategori Kurang (Desa)  0